Extension of the production and packaging hall | Abbott GmbH

Wiesbaden, GER

Abbott wiesbaden 02

To create a new packaging area for diagnostic products an existing production hall was expanded. A new packaging line and two cold stores were integrated into the new production hall.

The expansion was carried out during ongoing operations, which necessitated extensive protective measures on the extension axis to the existing building in order to maintain the adjacent production during the construction work.

  • Location
    Wiesbaden | GER
  • Year
    2021
  • Typology
    Laboratory Buildings
  • Status
    Built
  • Location
    Max-Planck-Ring | 65205 Wiesbaden | Deutschland
  • Client
    Abbott GmbH
  • Procedure Type
    Direct Commission
  • Work Phases
    2-8
  • Team
    Roger Christ I Ronni Neuber (Projektleitung)
Abbott wiesbaden 04

Related Projects

Abbott wiesbaden abfüllraum 07

Installation of a laboratory area for filling and packaging diagnostic products | Abbott GmbH

Wiesbaden, GER

Abbott Wiesbaden 01

Administration, conference and laboratory building Abbott GmbH & Co. KG

Wiesbaden, GER

Abbott empfangsgebaeude wiesbaden 05

Conversion of the reception building | Abbott Laboratories GmbH & Co. KG

Wiesbaden, GER