Installation of a laboratory area for filling and packaging diagnostic products | Abbott GmbH

Wiesbaden, GER

Abbott wiesbaden abfüllraum 04

A new laboratory area for filling and packaging diagnostic products was integrated into the existing production hall during ongoing operations. Since some of the products are serum of human origin, the filling process is carried out in a laboratory of protection level 2. In order to produce under aseptic conditions, a class 8 clean room with an integrated class 5 clean area was created.

The installation was carried out during ongoing operations, which required extensive protective measures in the existing production hall.

  • Location
    Wiesbaden | GER
  • Year
    2021
  • Typology
    Laboratory Buildings
  • Status
    Built
  • Location
    Max-Planck-Ring | 65205 Wiesbaden | Deutschland
  • Client
    Abbott GmbH
  • Effective Area
    400 m²
  • Procedure Type
    Direct Commission
  • Work Phases
    2-8
  • Team
    Roger Christ I Ronni Neuber (Projektleitung)
Abbott wiesbaden abfüllraum 03
Abbott wiesbaden abfüllraum 06
Abbott wiesbaden abfüllraum 01

Related Projects

Abbott wiesbaden 05

Extension of the production and packaging hall | Abbott GmbH

Wiesbaden, GER

Abbott Wiesbaden 01

Administration, conference and laboratory building Abbott GmbH & Co. KG

Wiesbaden, GER

Abbott empfangsgebaeude wiesbaden 05

Conversion of the reception building | Abbott Laboratories GmbH & Co. KG

Wiesbaden, GER

Abbott neubau eines tiefkühlhauses cover

New construction of a refrigerated storage building | Abbott Diagnostics GmbH

Wiesbaden, GER